Search companies

Live

GBM RESOURCES LIMITED. (ASX: GBM)

Materials · News and insights

Price unavailable

Latest GBM announcements

Announcement Insights

GBM Drilling Extends Twin Hills Beyond Resources As Regional Exploration Expands

GBM’s Twin Hills drilling has increasingly pointed to potential resource growth, with results reported beyond existing resource boundaries at Lone Sister and 309 and a broad intersection entirely outside Lone Sister’s resource. The company said on November 9 that an updated resource estimate remained on track for the end of November, following completion of about 60% of its 50,000-metre Stage 2 program reported in October; it has also started drilling six regional targets. Metallurgical tests have recorded recoveries of about 92% to 99%, but GBM says further testwork is needed before choosing a processing route, with flowsheet design expected in the first quarter of 2027.

Updated 12 Nov 2026, 06:23 PM Sydney time
Share
SourcesCorporate PresentationBroad High Grade Gold Intersected Outside Lone Sister MREExploration Drilling at Multiple High Priority Gold TargetsSeptember 2026 Quarterly Report
Comments

GBM Highlights High-Grade Drilling and 92–99% Gold Recovery at Twin Hills

2026-11-12 · Materials

GBM: $0.019 +5.56% · MC: $93M

GBM Resources’ November presentation highlights recent Twin Hills drilling, including broad gold intersections outside the existing resource, while an updated resource estimate is underway. Earlier quarterly results reported rougher flotation recoveries above 90% at both deposits; the presentation says further testwork is needed before selecting a processing route, with flowsheet design expected in the first quarter of 2027. The company also says drilling is underway at multiple regional targets as it advances technical studies and development options.

Updated 2026-11-12 18:13
Share
SourcesCorporate Presentation
Comments

GBM Reports Broad Gold Intercept Beyond Lone Sister Resource

2026-11-09 · Materials

GBM: $0.018 +5.88% · MC: $93M

GBM Resources reported a broad gold intersection entirely outside the current Lone Sister resource, alongside further mineralisation beyond existing resource boundaries at Lone Sister and 309. The company says its updated Twin Hills resource estimate remains on track for completion by the end of November, after laboratory backlogs were cleared and the database quarantined; it says the results may support resource growth and improved confidence.

Updated 2026-11-09 08:23
Share
SourcesBroad High Grade Gold Intersected Outside Lone Sister MRE
Comments

GBM Starts Drilling Across Six Twin Hills Gold Targets

2026-11-04 · Materials

GBM: $0.017 -5.56% · MC: $93M

GBM Resources has begun exploration drilling at six high-priority targets around its Twin Hills gold project, expanding work beyond the established 309 and Lone Sister deposits. The program is guided by integrated geological, geophysical and historical data, including old gold intersections that have not been followed up, while an airborne electromagnetic survey and onsite rapid-assay testing are also underway or being introduced. The company says the regional work is intended to build a pipeline of prospects alongside ongoing resource drilling.

Updated 2026-11-04 09:03
Share
SourcesExploration Drilling at Multiple High Priority Gold Targets
Comments

GBM Drilling Extends Twin Hills Gold Beyond Existing Resource

2026-10-29 · Materials

GBM: $0.019 +5.56% · MC: $93M

GBM Resources says drilling at Twin Hills has extended gold mineralisation beyond its existing resource and returned broad intervals that may support local grade uplift, ahead of a planned resource update. The company has completed about 60% of its 50,000-metre Stage 2 program, while initial tests recorded gold recoveries of approximately 92% to 99%; it also reported cash and listed investments totalling approximately $26 million and no debt at quarter-end.

Updated 2026-10-29 10:41
Share
SourcesSeptember 2026 Quarterly Report
Comments