Brightstar Identifies 11 Sandstone Gold Targets, Plans November Drilling
BTR: $0.555 +0.91% · MC: $941M
Brightstar Resources has identified 11 potential Two Mile Hill- and Bull Oak-style gold targets along the Sandstone project corridor, where those two deposits already account for approximately half of the project’s 3.6 million ounces of resources. The targets range from areas with existing resources to undrilled geophysical anomalies; an initial reverse-circulation drilling program is planned for November, with broader corridor drilling planned for 2027. A gravity survey is underway to refine additional targets ahead of future testing.

Comments